Showing posts with label cycling. Show all posts
Showing posts with label cycling. Show all posts

Friday, 5 January 2018

'Liveable neighbourhood' plans for Deptford Park and environs

Late last year Deptford Folk (the user group for Deptford Park and Folkestone Gardens) got the welcome news that a bid for funding from TfL had been successful. The bid was developed in partnership with Sustrans and proposes a number of improvements to walking and cycling routes in and around the parks - some of them quite substantial projects in their own right.

The money is coming from the 'liveable neighbourhoods' fund and the first tranche will be used to cover the cost of further feasibility studies, with a second slice paid out later for the actual work, presumably depending on the projects being proved feasible - a potential total of £2.9 million for these schemes.


The overall package includes six 'Copenhagen Crossings' (improved road crossings for cyclists and pedestrians) at locations around the parks, and seven more substantial 'interventions' which involve improving existing cycle routes, and creating and opening up new ones, among other things.

One of the flagship 'interventions' which would impact directly on access to Folkestone Gardens is improvement of the existing crossing of Rolt Street, which links the Woodpecker estate (and the pedestrian and cycle route through it) to the gardens.

Although this already exists as a raised crossing, and is on the bend of a road ostensibly with a 20mph speed limit, anyone who uses it will know that this counts for very little. A lot of traffic uses this route as a cut-through, especially in the rush hours, and much of it takes this corner way too fast. There is no refuge or island to slow drivers down, and visibility is poor for anyone coming out of the park, due to the bend in the road and the density of parked cars outside the houses.


Last year Sustrans held a public workshop which involved restricting the road width with some cunningly-arranged straw bales, and inviting school groups and passers by to experience the new road environment and give their feedback on the idea.


During this 'temporary street event' Sustrans also recorded the number and speed of vehicles that passed in both directions - this was collected over a seven day period, 24 hours a day, including the day of the event. Data (which is published in the report here) showed a reduction in traffic speed of around 23% in one direction and 17% in the other at the counter nearest to the restriction. 


I'm curious as to whether this speed reduction would be a permanent outcome of the traffic calming measures that Sustrans is proposing. How much of the speed reduction was down to drivers wondering why there were bales of straw in the road, and kids were prone on the road behind them? Don't speeds just creep back up once drivers get accustomed to new driving conditions? I presume Sustrans has monitored what has happened in other schemes, and I'd be keen to know how it pans out in the long term.

One of the other major projects that the funding will be used to investigate is the plan to create a new cycle route under Evelyn Street, right next to the Blackhorse pub. This route will provide a safe route for cyclists and pedestrians between the parks and estates on the west side of Evelyn Street and the riverside paths and parks of the Pepys estate and Surrey Docks.



It is a collaboration between Deptford Folk, Sustrans, the Ramblers Association, Lewisham Cyclists and Lewisham Council and would create a new route along the line of the former Surrey Canal.

I'm particularly excited about this as when I looked back in the archive I realised I've been banging on about it for seven years now. Seven years! Turns out I've got stamina!

You can read my initial blog post here which includes a photo of the bridge parapet, and a subsequent one here, in which I remarked on improvements to the layout of the buildings proposed for the Wharves development (now the Timberyard) which would make this route a possibility.

It will also build on Deptford Folk's subsequent work which involved objecting against the planning application for the Shurgard storage facility that has just been built at the end of Blackhorse Road. If this application had passed in its original form, the building would have obstructed the proposed route. But Deptford Folk was successful in challenging the application, with the result that the building footprint was moved slightly to leave space for a cycle route on the west side of the road.

With the recent funding award we may at last find out how feasible this idea is, and perhaps even see it brought to fruition in the near future.


More details of the Deptford Folk plans can be seen on the web page here, and if it's something you want to get involved with, they also have an email newsletter you can sign up to, so you'll be kept in the loop. 

Tuesday, 10 October 2017

Cycle superhighway proposals for Creek Road and Evelyn Street

TFL is rolling out plans to expand the cycle superhighway network across this part of London, and is currently consulting on proposals for a new route between Tower Bridge and Greenwich.

As well as creating fully segregated cycle lanes along the entire road, a whole host of other improvements are planned, not just for cyclists but for pedestrians as well. Simplified pedestrian crossings and improvements to public realm are proposed; one bus stop fewer is proposed for the Deptford Park section of the road, and most of those along Evelyn Street are set to be moved one way or another to make spaces between them a bit more even.

The overview map is shown below - there's no detail as yet on the plans for Lower Road, apparently this is still in consultation with Southwark given that the area around Canada Water is due to be heavily redeveloped in the near future.

The plans so far show the segregated cycle lanes crossing from the north side of the road to the south side just before Southwark Park, so that cyclists and motorists will no longer come into conflict on the unpleasant Rotherhithe roundabout. Further along on Evelyn Street they are back on the north side of the road, but as yet there are no suggestions as to where or how this will happen - presumably at one of the junctions that is earmarked for full remodelling.


(Click for a bigger version)

Plans for the bottom end of Deptford High Street are shown below - the current situation top (although this is now slightly out of date with the new, widened pavement already in place) and the proposed segregated lanes on the second image.



The main change to what's there now are restrictions on right turns and the removal of the two pedestrian crossings, which will be combined into one single crossing and brought much closer to the end of the high street.  

Motorists will no longer be able to turn right out of Deptford High Street towards Greenwich, nor will they be able to turn right into DHS from the Greenwich-bound lanes of Evelyn Street, which makes a lot of sense in terms of simplifying the situation for cyclists and pedestrians here. There will also be a ban on right turns out of Watergate Street.

Being a regular cycle commuter I'm firmly in favour of this proposal, and having used the segregated lanes in central London I relish the idea of similar facilities in our local area, making bike travel safer and easier for everyone.

Consultation is open until 19th November and there are plans available in the Deptford Lounge and Canada Water Library throughout the consultation - there's also a consultation event at Deptford Lounge this weekend where TFL staff will be present to answer questions (see below).

The online consultation has links to much more detailed maps of each section of the proposed route.

Consultation events:
Saturday 14 October 11am-3pm, Deptford Lounge 9 Giffin Street, SE8 4RH 
Tuesday 17 October 4-7pm, St Alfege Church Hall, 3 Greenwich Church Street, SE10 9BJ 
Saturday 21 October 11am-3pm, James Wolfe Primary School, 21 Randall Place, SE10 9LA Wednesday 25 October 3pm-7pm, The Finnish Church, 33 Albion Street, SE16 7JG 
Saturday 4 November 11am-3pm. The Finnish Church, 33 Albion Street, SE16 7JG 


Thursday, 2 February 2017

Improvements to Deptford High Street

Lewisham Council has got some funding from Transport for London to pay for improvements to the north end of Deptford High Street and the six-month programme of construction work is set to start next week.

Improvements to the south end of the high street were carried out a few years ago with money from the Mayor of London's Outer London fund, and because this fund had a wider scope, the bid also included money for other improvements such as the shopfronts that were jazzed up, and to support the development of the 'food market' which was such a painful flop.

There's none of that fluffy stuff with the TFL funding that's being used for the north end - it's all got to be tangible stuff that makes the street a more pleasant, and safer place for pedestrians and cyclists in particular. But it's not all about getting rid of trip hazards and putting some seats in - there will be some kind of arty lighting installation under the railway bridge designed by light artist Peter Freeman. There's also going to be a few new trees, although not very many, and some new paving with words carved in it on the approach to St Paul's church.


(click to see a bigger version)

I wrote about the consultation for the plans last year; there's been some changes to the original plans, mostly for the better as far as I'm concerned. They have steered away from blunt (and most likely ineffectual) one-way restriction that was suggested for the section of street between Edward Street and the junction with Evelyn Street, and instead gone for some rather more subtle and probably more effective controls.

There will be a ban on right turns out of the high street into Evelyn Street, and into the high street by Greenwich-bound traffic on Evelyn Street; there will be no left turn out of Frankham Street into Giffin Street to prevent traffic rat-running through before the lights; there will be a ban on lorries of more than 7.5t turning into Giffin Street from Deptford Church Street, and there will be a new chicane on Giffin Street outside the former HSBC Bank with priority to eastbound vehicles.


Footways will be widened with parking bays set into them; consequently the highway will be much narrower which should in theory slow traffic down. If you've lived here any length of time you'll be aware that theory doesn't always apply in Deptford, especially when it comes to the highway code. Let's hope that in this case it might.

The main aims of the work are:
  • Improved wider footways  
  • Connection with future proposed crossing improvements at the junction with Evelyn Street to provide a safe, attractive and direct route between the river and the High Street. 
  • Trees and seating to the Evelyn Street junction. 
  • Creation of a pedestrian and cycle friendly environment that caters for the expected increase in people using the street. 
  • Traffic calming measures. 
  • Improvements to parking provision and improvements for Blue Badge holders. 
  • Introduction of a new taxi rank below the railway bridge to serve the High Street and Deptford Station. 
  • Artistic lighting under the railway bridge. 
  • Enhanced design retention of heritage elements at the St Paul’s and Crossfield St junction.


You can download the details from the council's website here or there are plans on show in the Deptford Lounge at the moment - although I'm not sure how long for.

Saturday, 28 January 2017

Deptford bikes

Have you got a bike languishing somewhere that needs fixing so you can ride it?

Maybe you want to learn more about keeping your own bike in shape so you can save money on maintenance?

Or do you just want to meet cycle buddies and find out some of the good routes to ride around the area?

Deptford Folk, the community group representing the users of Folkestone Gardens and Deptford Park, has won a grant from the Community Cycling Fund for London to develop cycling projects and activities in the area.

They are working with Lewisham Cyclists as their delivery partners and right now are planning a programme of rides, bike maintenance training, repair sessions and fun things to do with bikes.

The first event is a series of bike maintenance and repair lessons starting on Thursday 19th February at Ron Hoskins Hall, Childers St, Deptford SE8 5NU.

The lessons start at 7pm and run till 9.30pm. Each class has space for four, and you can attend one or more sessions. They will be run on a donation basis.

Contact Jane on 07826559603 or email lewishamcyclists@gmail.com to book a place.

19th February: Bike check and cleaning: Removing wheels and tyres: Mending punctures
26th February: Brakes (Rim brakes only)
2nd March: Gears

For more events follow either Deptford Folk or Lewisham Cyclists on Facebook, Twitter or by signing up to mailing lists on their websites.

Tuesday, 16 August 2016

Surrey Canal linear park now open

A new route from the Pepys Estate through towards Surrey Quays has recently been opened up, linking Eddystone Tower and its neighbours, and the under-construction Timberyard development at Oxestalls Road with the various new residential blocks on Plough Way, most of which are named after one wharf or other. Along the route of the former Surrey Canal, it offers a much more pleasant and direct route for pedestrians and cyclists between the Deptford estates and the shopping centre at. Surrey Quays 


The same palette of materials has been retained across the full length of the route - which has been funded by money (presumably Section 106 payments) from the new developments at the west end of the borough.

The public realm is generally quite pleasant with granite edging intended to represent the position of the former canal, shrub and flower planting along the edges and some new trees proposed. At the far west end of the link, right in the middle of the new development, is Plough Way Cafe which is housed in a nice little modern building with outdoor terrace.


While the materials have been matched throughout the route, there's a notable difference between the facilities in each section. The new developments get logs shaped into cute little sheep for kids to play on, and poetry inscribed into the granite edging.



Down at the Pepys estate they have to make do with a couple of logs half buried in gravel and an expanse of timber decking.


Joking apart I am looking forward to the route under Oxestalls Road finally being opened to cyclists and pedestrians - and maybe even a link at the east end of the Timberyard development going under Evelyn Street to Blackhorse Road? The latter is physically possible now thanks to some hard work by Deptford Folk and Lewisham Cyclists to amend a planning application for Shurgard that would have blocked off this access.

Sunday, 7 February 2016

Folkestone Gardens and Quietway work

I regularly go through Folkestone Gardens and am often saddened by the neglect and abuse this little park suffers.

With gates wide enough to admit cars at two sides of the park, it often fell victim to fly-tipping and I once witnessed a motorist trying to drive a car through the park on the footpath and flying into a rage when a dog-walker challenged him. Eventually the park managers clocked that it might be a good idea to restrict access at these gates, and the problems stopped for a while.

Where once was shrubbery...
Meanwhile the vicious 'pruning' exercised by Glendale last year saw the bushes and trees decimated to a shadow of their former selves, and problems with rough sleepers using wood from the remaining trees to create campfires does not help.

..now is a campsite

As part of the implementation of TFL's new Quietway cycle routes, the council has been able to leverage some funds to make improvements to Folkestone Gardens, and both of these projects are under construction concurrently, albeit at a snail's pace.


A new skateboard park is being built at the east end of the gardens, as part of a scheme that was intended to make much better use of space in what was originally a somewhat sprawling play area. This came out of an initiative by a youth group who successfully applied for a grant of £50k towards improvements to the piss poor skate ramps that were already in the park. The council weighed in with a further £225k from section 106 funds and carried out a consultation exercise about what it proposed for the new 'skate and play' park.  

The consultation document had some plans of how the skate and play park would look.


Unsurprisingly, given the name, and the published plans, local people were expecting that there would be some new 'play' as well as some new 'skate'. Now that the work is almost finished, however, it has become clear that the new 'play' is just the old 'play' in a smaller area. 

Promises of new equipment have not materialised, and it seems that the contractors have just lifted the old play equipment and moved it to the other side of the play area. 


One beacon of hope is that the disused toilet block next to the road has been given planning permission to be refurbished and opened as a cafe. I suspect a new roof may be necessary, but it will be good to have this rotting shell brought back to life.


As far as the 'Quietway' goes, the paths through the park have been made bigger, presumably to accommodate cyclists as well as pedestrians. But they seem oversized to me, especially the huge junction by the old toilet block - I've been using the park for years and the only conflict I've ever witnessed on the footpaths was the aforementioned car driver and dog walker. I think the park would have been better with a bit more grass left intact.


It will be a great improvement to have better surfacing in the tunnel between the park and Gosterwood Street, which has always been a bit of a gloomy route at night and prone to fly-tipping. Let's hope that there will be lighting too, which might deter some of this abuse.


I was disappointed to read in Lewisham Cyclists response to the plans for the quiet way that in Folkestone Gardens they made a plea for 'significant vegetation clearance around the route to make it more visible, particularly on corners'. Well they certainly got that.


I found this comment particularly unnecessary because there are two routes through the park; the one with the vegetation, blind corners and absolutely no lighting, and another one with very little in the way of blind corners, and which is lit by the street lights at night. In the summer I tend to take the former, in the winter I take the latter. They both lead to the same place. There is also a perfectly reasonable, direct alternative on the road for anyone who feels uncomfortable using the park when it's dark.

It does beg the question of whether it's a park or a cycle route with some greenery. I would like to see them co-existing happily, but the recent changes seem to be putting more emphasis on cycle access than on the green environment, wildlife and somewhere that can be quietly enjoyed by all.

As an aside, and with reference to my post about the high street rat-running problems, the initial plans for the quietway included a road closure at the junction of Childers St and Rolt St, but this was vetoed by local people who didn't want to have their driving routes impacted. I thought it was a great idea and suspect if it had gone ahead we wouldn't now be faced with the continued problem of rat-running on the high street! 

Wednesday, 27 January 2016

Consultation on proposed Deptford High Street improvements

Lewisham Council is consulting on proposed improvements to the north end of Deptford High Street, being in possession of some funds from Transport for London to tart it up a bit. Which is music to my ears, given I've been banging on about its unloved state for some years now.

The intention is to improve the street for pedestrians and cyclists, which would make a huge difference to those who use it on a regular basis. There's some good stuff in here, but I'm don't believe the proposals go far enough, and in one respect, they miss the target completely.

Yes it's already a 20mph zone!
The overwhelming threat to the safety of pedestrians and cyclists on Deptford High Street is the traffic - not just the volume of traffic that uses it, but the way that traffic behaves.

Bowling along: a popular rat run with all sizes of vehicles

In the morning rush hour, from 6am or earlier, great convoys of vehicles bowl down Giffin Street and Deptford High Street seeking to escape the traffic jams of Deptford Church Street and Evelyn Street. As the shops start to open and vehicles begin parking along the high street, delivering goods to businesses or building sites, speeds are tempered but space is restricted and the pavements are seen as fair game by drivers.

Woe betide any pedestrians strolling unsuspectingly along those sections which don't have bollards - they are likely to find themselves face to face with scaffolding lorries, tipper trucks, white vans and even mopeds who mount the pavement and drive along it to pass traffic coming the other way, with no regard at all for anyone walking past.


If you live or work in Deptford, or use the high street regularly, you'll be totally familiar with this.

Unfortunately it seems that the people devising the scheme, or those advising them, have no idea about traffic in Deptford.

For example, where is it going and how does it behave?

Naturally in the morning rush-hour, the traffic is all London-bound, following rat-runs in an effort to cut the drive time. But the measures proposed by TFL/The Project Centre/Lewisham Council suggest that someone hasn't done their homework.


The proposals are to put a restriction at the end of Deptford High Street 'to reduce rat-running' and 'create a new public space'. It might do the latter but it sure as hell ain't going to do the former! 
It's clear to anyone who has spent even half an hour observing traffic movements on the north end of high street that the vast majority of vehicles are rat-running down Edward Street, not Evelyn Street. 
They follow the well-worn route along Edward Street and Sanford Street to Surrey Canal Road, where they either turn right to take Trundleys Road towards Surrey Quays/Rotherhithe Tunnel or left towards Ilderton Road and on to the backroads of Bermondsey. 

To eliminate rat-running, any one-way restriction should be on Edward Street or on the high street south of this junction, but this will still only resolve the problem when traffic is in one direction.

(Although of course there's always the possibility that a one-way restriction will be treated with the same contempt as motorists treat the one-way restriction at the end of Crossfields Street.)

A public space would be good though. Can anyone think what kind of iconic monument or sculpture we might put there to celebrate Deptford's incredible history? (Click here for a hint if you can't guess).

(Click to see full size)

The sketch shows potential improvements in front of St Paul's Church, which would be welcome as it's a very uninspiring bit of public realm at the moment; the suggestion that 'unnecessary street furniture' would be removed to unclutter the pavements is also a welcome one.

I was a little confused by the the flyer which is provided on the consultation page, because it includes two sets of objectives, some of which are the same and some of which are different. I've tried to distill them into the objectives, and the means of achieving them

The objectives of the scheme are:
  • Make the street more pedestrian friendly and encourage cycling and walking
  • Encourage a less cluttered and safer feel 
  • Enhance and conserve the historic character of the street 
  • Improve accessibility
  • Support the introduction of a borough-wide 20mph speed limit, reducing vehicle speeds and improving safety at junctions. 
  • Control parking and loading in designated bays
  • Provide a safe, attractive and direct route between the river and the High Street 
Here's how they intend to do it:
  • Improve footways to make them wider using quality paving materials and provide level crossing areas at junctions
  • Remove unnecessary street furniture
  • Connect with proposed crossing improvements at the junction with Evelyn Street 
  • Assist the local economy by improving power facilities for the Saturday Market between Giffin St and the station
  • Retain 30 minute parking provision and provide parking improvements for Blue Badge holders
  • Extend the Restricted Parking Zone (RPZ) along the whole street 
  • Introduce a new taxi rank below the railway bridge to serve the High Street and Deptford Station 
  • Improve lighting under the railway bridge
  • Provide level crossing areas at junctions
The objectives are all well and good, but some of the measures seem contradictory; I'm not sure if there is room to widen the pavements AND retain designated parking bays without blocking the road - certainly in the stretch to the north of the railway bridge, in front of the Waiting Room, Johnny's DIY and Bearspace Gallery etc. This is already the section where pavement rally driving is rife, and lowering kerbs like they have done at the south end is only going to make that worse.

Pavements are for tipper trucks, apparently.
The two ends of the high street are totally different in their traffic patterns and usage - the south end is one-way along its whole length, has a market on it three days a week, and is not really a direct or convenient route for highway traffic. The north end is a major commuter rat run, and combines this with a large volume of pedestrian traffic going to and from the station and the two schools. I strongly believe that a different approach is needed if there are to be any significant improvements for pedestrians and cyclists.

Enhancing and conserving the historic character of the street is going to take a lot more than just some new paving stones - for a start the council's planning enforcement team needs to get to work on all those UPVC replacement windows and oversize illuminated signs that keep sprouting up without planning permission.

I'm not sure how I feel about a taxi rank at the station - it's not something that I'm likely to use as I'm within easy walking distance of the station, and in any case there are at least half a dozen bus routes within a few minutes' walk. I guess there will only be taxis on the rank if there's a demand, but it will mean taking regular parking bays out of use for something that might not be required.

Enhanced lighting under the bridge, on the other hand, will be a great improvement.

The prospect of enduring another year or so of roadworks and disruption, with only minimal improvements, is not a pleasant one. I do hope that feedback will enable a more effective approach to be developed so that the benefits can be felt.

The council is holding a drop-in session in the Deptford Lounge foyer between 3pm and 7.30pm on 3rd February where you can speak to the project consultants, Project Centre, and the Lewisham Council team about the project, and presumably give your comments.

Friday, 5 June 2015

Deptford Broadway improvements: TFL consultation reports

TFL has published a report into its consultation on proposed improvements to Deptford Broadway junction.

The proposals were heavily criticised by Lewisham Cyclists who pointed out that not only did changes do little to improve conditions for cyclists, in some cases they made it more dangerous.

According to TFL, the following changes have been made to the scheme:

  • Deptford Broadway (eastbound) – the advisory cycle lane will be upgraded to a mandatory lane on the approach to the signals, beyond the left turn slip road into Deptford Church Street. However after further review of the design, the advisory cycle lane across the left turn slip will be retained. In addition to this, the footway will be built out up to the loading/parking bay on the slip road by extending the footway kerb line. This narrows the entrance into the slip road which in turn will slow down motorists when crossing the advisory cycle lane. A coloured surface on the slip road as far as the raised uncontrolled pedestrian crossing will also be provided so that to motorists it does not ‘read’ as a conventional part of the carriageway. 
  • Deptford Bridge (westbound) and Deptford Church Street (southbound) – The advisory cycle lanes will be upgraded to mandatory lanes on the approach to the signals. 
  • Deptford Bridge (eastbound) – The build-out (‘bulge’) at the toucan crossing just west of the DLR Bridge will be reduced to widen the carriageway and the existing bus lay-by modified in order to accommodate two traffic lanes and a 1.5m advisory cycle lane. This will provide a safer passage for cyclists along this section of the road.
  • Additional cycle logos will be provided where necessary for motorists’ awareness.
They are minor changes that are some improvement on what was offered; I rarely use the junction on my bike, so I will be interested to see what Lewisham Cyclists have to say about it.

As a pedestrian I'm disappointed that they are not taking the opportunity to bring the crossing on the eastern side of the junction up to the junction itself. Apparently this was because it would have a negative impact on the flow of traffic, which is TFL's main priority. I have to say I find this difficult to believe - it's not like they were putting a crossing in where none existed already, it would simply have meant relocating it by 30m or something. 

The report does not include an updated junction plan, so I've reproduced the one from the original consultation below. 

According to TFL the works are intended to be carried out 'between June and November 2015'. Not sure if that means it's going to take six months, or if it will be carried out within that period.

UPDATED 26 JUNE: The works have now started, so watch out for traffic chaos on the Broadway.

Sunday, 10 May 2015

New cafe/bike shop for Deptford High Street

I've never really quite understood the thing about bike shops with cafes - it's a fact that both bikes and coffee play a major part in my life, but other than parking my bike outside a cafe to have a good strong cappuccino, I find myself somewhat stumped.

But I'm clearly a bit old-school on this; they seem to be popping up all over the country and we've got our own coming to Deptford High Street with London Velo set to open at the end of May.

Aside from being a godsend for anyone who wants to have a chat about their fixie while sipping a flat white, it will certainly be a useful addition for those coffee addicts living in Deptford New Town who otherwise have to schlep all the way down to the Waiting Room for their caffeine fix.


The new shop is right next to Tesco on Deptford High Street, a unit which has been empty for some time, so it's great to see it being brought back into use.


As well as coffee and bicycles, London Velo is promising music, food, free wifi and...beer! They are being ambitious with their opening hours - till 8pm weekday nights, till 10pm Friday and Saturday and 10 till 6 on Sundays. I wholeheartedly support anyone trying to bring a bit more life to the high street outside of the normal shopping hours, so I'll be delighted if they manage to make this work.

Some may suggest that the opening of London Velo will put the high street in a bit of a hipster clinch, what with skate and BMX shop Curve already established down at the far end. 



I haven't written much about Curve ('Deptford's finest Skate BMX & Clothing shop') since it would mean revealing my shocking ignorance of anything to do with aforementioned sports, but again it's great that an empty shop unit is being used for a small, independent business that adds diversity and attracts more footfall to the high street.

Saturday, 28 March 2015

Bike parking in Lewisham - need some near you?

Lewisham Cyclists has shared the following information for anyone who wants to request new bike parking - whether secure on-street parking, if you don't have room inside your own flat for your bike - or new hoops close to shops, a pub or some other place in Lewisham borough where they are needed.

Sheffield stand-type parking

If you want 'Sheffield stand' type parking, for example at your local shopping area, send an email to highways@lewisham.gov.uk with the subject line 'Cycle parking request' and a note of the specific location where you would like stands to be installed.

You should receive a response by email indicating when your request is likely to be reviewed for potential implementation.

Bikehangers on Pepys estate

If you are interested in getting a 'Bikehanger' installed in your street to provide secure on-street parking for bikes, please send a request to highways@lewisham.gov.uk with 'Bikehanger' in the subject line.

Implementing Bikehangers takes longer than Sheffield stands as there needs to be an identified demand in the general area and prior local consultation is often needed. So if you do want one encourage your neighbours to email as well. There is also a modest annual charge for use of a Bikehanger to cover upkeep and key management.

Wednesday, 28 January 2015

Has TFL finally got the message about Deal's Gateway?

Transport for London has today launched a consultation into further revisions of the major highway junction at Deal's Gateway where Greenwich High Road joins the A2 just east of Deptford Bridge DLR station.


The proposed changes to the highway markings and layout are shown above (and explained in more detail on the consultation site) but the most significant concession is TFL's acceptance that separate green phases are needed for lights controlling traffic from Deal's Gateway and Greenwich High Road. The addition of new pedestrian crossings is also welcomed.

It's now more than four years since the original change that saw the separate green phases being removed after TFL deemed them unnecessary, leading to treacherous conditions for traffic (which includes a large proportion of cyclists) exiting from Deal's Gateway to Greenwich High Road.

A concerted campaign by Lewisham Cyclists - including some hair-raising videos of the conditions - led to some minor changes being implemented, but despite this, no significant change to the signal phasing.

It's great news that they are finally considering bringing the separate phases back, it will make a huge difference to all the traffic that uses this route, not just cyclists.

With changes to the adjacent junction at Deptford Broadway currently under discussion, let's hope they can learn from the experience and pay attention to feedback from user groups such as cyclists and pedestrians so that they can get the improvements right first time round.

Saturday, 24 January 2015

Kent Wharf planning application

Crosswhatfields has already written in some detail about the planning application for Kent Wharf on Creekside, a parcel of land which extends from opposite Ferranti Park to the banks of Deptford Creek, and which now includes the VW parts dealer/garage directly opposite the end of Bronze Street. Sun Wharf, which is where Jones Furniture is currently housed, is expected to be redeveloped once Jones' lease expires in 2022 (or earlier presumably if they find another site and decide to move on before they are shown the door - one more sad employment loss for Deptford). It's another prime Creekside spot, so expect lots more high rise residential to be proposed.


The planning application for this site is already with Lewisham's planning department and the 'official' consultation period ended early in January.

But if you want to comment don't let this put you off; the planning officers will accept feedback right up to the time the application is considered by the strategic planning committee, although the sooner you get your comments in, the more likely they are to impact on the final report.

As always, don't forget to copy your comments to your local councillors, as well as members of the strategic planning committee, whose details can be found here. Objections and other feedback is usually summed up by the planning officers for the purpose of the report, so it has a more direct impact if you copy it to the councillors themselves (assuming they read it of course!).

The application is for a mixed use development at Kent Wharf and 24a Creekside which will consist of three buildings ranging from six to 16 storeys, containing 143 flats and 1,375 square metres of 'commercial' floorspace.

What kind of trees are those? Monster trees?!
The 16-storey building has been put at the corner of the site, apparently after a series of pre-application meetings with council planners and feedback from the design review panel, much of which is detailed in the design & access statement if you want to read it. There's a lot of focus on how the buildings reached their final positions and layouts, but little on how they reached their final heights, which I would have been more interested to hear. 

As usual there seems to have been no consideration as to what is appropriate in terms of building heights for the area, with developers always benchmarking their proposals against the tallest examples they can find. It would be so refreshing to read a design statement explaining how the architects had put together a masterplan that respected the four-storey neighbouring residences rather than ones that competed with a series of blocks three streets away. They nearly always try to justify towers as creating 'landmarks' and 'way finders' but fail to acknowledge that it's going to be impossible to identify one from the other when they are all the same height and block views of anything but the street and the nearest facade.

View from Deptford Creek - the white block on the left is the building currently housing Jones Furniture 

In the case of this application, the height of the buildings is my biggest gripe, mainly due to the impacts they are going to have on the neighbouring land, in particular the public spaces and parks which will suffer much greater shadowing as a result. But is there any process for measuring this loss of amenity? Some of the flats on Crossfields estate will also lose light as a result of the tower and they have a case for objecting - ultimately though the greater good of building more housing will no doubt prevail over the quiet enjoyment of a handful of residents. 

The view along Creekside with the three-storey Cockpit Arts in the foreground. More monster trees!



Just one more word about scale: the elevation above, which is looking directly at Kent Wharf from the Deptford High St direction, is useful in that it shows the scale of the smallest buildings - you will have to peer on the extreme right of the image where you can see the Cockpit Arts studios coming into view. And below is a mock-up of the scheme in situ, although the only item for scale here is the shelter in Ferranti Park.


Of the 143 housing units, only 18 will be allocated to anything other than private ownership. They will be 'intermediate', which is officially defined as 'homes for sale and rent provided at a cost above social rent, but below market levels subject to the criteria in the Affordable Housing definition. These can include shared equity (shared ownership and equity loans), other low cost homes for sale and intermediate rent, but not affordable rented housing'. As a percentage of the whole development it's pitifully low, even in these supposedly straitened times. I hope the planning committee will raise this as an issue since it now seems to be a favourite theme for Lewisham's mayor.


I put this rendering in to show the view from street level, although it was cropped in the report, preventing me from enjoying the full rearing presence of the main tower. The inclusion of only two cars makes it look very weird, especially without any of the double parking that's usually rife along this stretch of Creekside. 

Which brings me to traffic and parking.

The development includes just three car parking spaces, which I welcome wholeheartedly. The cycle parking provision is not as good as it could be, but still generous. Of course the lack of parking will encourage the new residents to use the surrounding streets - already heavily overloaded both in daytime with local workers and commuters and overnight with residents - making the introduction of a controlled parking zone inevitable. However the site's proximity to the boundary with Greenwich will need the two to work together if this is going to be successful. According to the transport assessment, residents of the new blocks will not be eligible to apply for parking permits if and when a CPZ is introduced.

Construction traffic is stacking up to be a major problem on Creekside - not necessarily due to this development, but the cumulative impact of the multiple developments that are expected to move to construction shortly. Everyone makes noises about using Deptford Creek for material deliveries and spoil removal, but no-one has made any effort to actually put it into practice. 

Don't forget the Thames Tunnel shaft is expected to start construction some time soon, requiring Deptford Church Street to be shut down to just two lanes for a period of three years, and requiring a predicted 140 vehicle movements per day. Faircharm redevelopment is estimated to require 180 vehicle movements per day so Kent Wharf's 20 vehicles (or 40 vehicle movements) is a mere drop in the ocean. But with the two sites next to Creekside Village having applications pending, not to mention Convoys Wharf, we look set to be dodging HGVs for the next five years or more. 

I was particularly confused to read that construction traffic is only being allowed to come via the A2 because the lifting bridge on Creek Road is dodgy (er, get it fixed? It has no weight limit posted as far as I can see). 

The travel plan suggests construction traffic should turn along Creekside at the Birds Nest roundabout which seems like a particularly risky route - not only will traffic be snarled up by the heavy parking that Creekside endures, but it will direct traffic along a quite major cycling route. HGVs and cycles? Rarely ends well.

I also gave a hollow laugh when I read that construction workers would not be allowed to park on the roads in the vicinity, and this would be policed by the contractor. The shambolic situation on Norman Road and surrounds (cars parked halfway up the Ha'penny Hatch footpath) when the Movement was being built was brought to mind, and the efforts and nagging I know people had to exert to get the situation resolved to any extent. It's a fine aim but in my opinion not worth the paper it's written on - many subcontractors are expected to bring their own tools and equipment and in practice I cannot see how this can be imposed.

One of the positives aspects which the design review process seems to have brought to this development is accessibility to the creek and some level of permeability on the site. A new path will open up access to the Creek, and presumably link into one alongside the Laban (otherwise it will be an utterly pointless dead end).


From the ground floor plan (above) you might be forgiven for thinking it is three buildings but in fact the two on Creekside are actually linked about ground floor level (see below)


A walkway leads into what they are classifying as 'semi-private' space - on paper a nice idea but even in this rendering I can't help wondering what those shady-looking characters are doing hanging about in the underpass.



Thursday, 15 January 2015

New riverside path finally on the horizon

On a morning pootle earlier this week I discovered that the riverside route from Wood Wharf through to New Crapital Quay is finally open! Yes, the much-misused cul-de-sac that used to serve as an impromptu rain shelter for fisherman, not to mention a venue for the misplaced youth of Greenwich, has finally achieved a more useful purpose. 


It's not much of a change at the moment, but does continue the traffic-free link a few hundred yards further towards Deptford. In due course there will be a new pub on the riverside as another stopping off point, but right now it's just a swathe of underwhelming public realm with more oddly-positioned seating (a view directly into someone's front room, anyone?).



From next Monday, of course, the route will continue still further with the opening of the new Deptford Creek swing bridge. The official opening takes place at 9am, for anyone who wants to attend and doesn't have a job to go to.